Home About MBO Team MBO Contact
 Home
 About MBO
 Team MBO
 Contact MBO
 Architecture 2030
 CO2 Reduction
 Commissioning
 Retro Commissioning
 LEED Commissioning
 Engineering Studies
 DOE Benchmarking
 Air & Water Balancing
 IRS Tax Deduction
 Green California
 Projects
Login




Over the past 3 years, MBO has Retro Commissioned over 3 million square feet of existing operational facilities; thus saving owners between 10% to 30% of their energy consumption.

Retro Commissioning is a process of systematic testing and analyzing the current systems and providing solutions for improvements.

MBO Inc. is experienced in monitoring systems performance data.  Our “Hands On” field engineers trend data through the existing building automation systems and portable data loggers; energy model buildings using DOE2 programs, such as eQUEST and Energy Pro; perform functional tests; and write implementation summaries to demonstrate that measures have been correctly implemented and energy savings have been achieved.

MBO Inc. tracks the performance of Division 15-17 operations to evaluate the persistence of savings.  Results are compared to the system-level benchmarks developed during the program and are presented in a final report.  The analysis may include a normalization of the performance of systems that are affected by the impacts of weather and occupancy.  Building operators and facility managers are invited to attend MBO’s review of these Measurement & Verification reports.

MBO Inc.   4619 Viewridge Ave., Suite C San Diego, CA 92123    858.751.5702    Email@MBO1.com